
Built for the builder's programme.
Volume lots, multi-lot sites and custom homes. A cladding, render and paint package that arrives when the frame is ready and leaves a certificate behind.
Substrate + render + paint
The full lightweight facade. Board or panel fixed to frame, acrylic render system with texture and topcoat, then the exterior paint schedule including eaves, trims and fascia where specified.
Price this package →Render + paint on masonry
Cement or acrylic render over blockwork, brick, Hebel PowerPanel or precast, with texture and membrane topcoat. For ground floors, garages, boundary walls and retaining.
Price this package →Cladding only
Render substrate or finished cladding fixed and ready for your own renderer or painter. Supplied with the fixing schedule and the installation checklist signed off.
Price this package →Estates, townhouses and staged releases.
Multi-lot work is a programme problem before it is a render problem. We staff it that way.
- Crews allocated per stage, not per house, so lots in the same release run in sequence with your frame carpenter and window installer.
- One substrate system per estate wherever the certifier allows it, so fixing schedules, render build-up and colour LRV rules stay consistent across every lot.
- Take-off by render type for every elevation, issued as a bill of quantities you can audit against the facade schedule.
- Fortnightly progress claims mapped to lot numbers and stages, with photographs of each lot at board, render and paint.
- Certificates of installation lodged per lot, manufacturer warranty registered per lot, and the full evidence pack supplied at practical completion.
- Site inductions, SWMS and crystalline silica controls completed before the first crew arrives, to your template or ours.
What the certifier gets from us.
A rendered lightweight wall is a Performance Solution supported by a CodeMark certificate. The certificate only holds if the installation matches the manual, so we document that it does.
| Document | When | Purpose |
|---|---|---|
| Current CodeMark certificate for the system quoted | With the quote | Confirms NCC scope, classes, wind and bushfire limits for the lot |
| Fixing schedule for the lot's wind class | Before board | Screw spacing, edge zones, batten or direct fix |
| Installation checklist, signed | At board complete | Manufacturer's checklist as required by the certificate conditions |
| Render build-up record | At render complete | Basecoat thickness, mesh, texture, topcoat and colour LRV |
| Certificate of installation | At completion | Lodged with the manufacturer; triggers the system warranty |
| Warranty registration and maintenance guide | With final claim | Passed to your client with the handover pack |
Volume does not mean plain.
Display homes, facade upgrades and the premium end of a release get the same crews that do our custom work. Shadow-line reveals, recessed expansion joints, parapet capping details and two-tone texture changes are detailed before the board goes up, not improvised on the scaffold.



The person who quoted it runs it.
Your supervisor deals with one Bespoke contact from take-off to final claim. The crew lead on the lot is the same person who signs the installation checklist, so a question on site gets an answer on site.
Full package, one trade
Substrate, render and paint from one crew under one contract. One programme, one site contact, one point of accountability when the certifier asks who did what.
Programme reliability
Crews sized to multi-lot work. Start dates that hold, stages that run in sequence with your frame and lock-up, and no gap between the board going on and the render going over it.
Warranty and compliance
Systems installed to the manufacturer's current manual, certificates of installation lodged, and the CodeMark evidence pack handed over with the invoice so your warranty stacks with ours.
Design-led finish
The Bespoke name is the standard. Colour and texture selection, architect-grade junction detailing and a finish that reads as architecture, not just as render.
